Local News

$28.5 Million CCHS Bond Referendum Would Mean Improved Air Quality, Larger Kitchen

Charles City High School was built in 1960. It hasn’t had any major work done to it in the 63 years since.

That would change if school district voters approve a $28.5 million bond referendum Tuesday (11.07) to revitalize Charles City High School. 

It’s been well-documented that the building is not air-conditioned, but that would be remedied with a new HVAC system if the bond passes. The school’s HVAC specialist, Brandon Gates, says a new system would also replace boiler heating units approaching their life expectancy and means the school’s hard-to-clean air tunnel system would be replaced with new air handlers to improve air quality for students and staff.

The bond would also mean enlargement of the High School kitchen, which Mike Butler of Southwest Foodservice Excellence, managers the kitchen and the student meals it produces, says is much needed. 

If approved, about two-thirds of the $28.5 million would go towards the revitalization of the High School and the other third to build a new 800-seat performing arts auditorium.  

The bond referendum will need a 60% majority YES vote to pass Tuesday.

 

Stay Connected with 95.1 The Bull

Add 95.1 The Bull as a preferred source on Google to see more local news, weather, and sports in your feed.

Add on Google

Follow us on Facebook for breaking news, severe weather alerts, sports, and more.

Mark Pitz

Mark Pitz is News and Sports Director for KCHA Radio, covering local news and sports across North Iowa. He also hosts Middays with Mark Pitz and is the radio voice of the Nashua-Plainfield Huskies on 95.9 KCHA.
Back to top button